Audit of Standard Main Design Solutions on The Gas-Turbine Unit 6FA

Within the framework of rendering services under the Contract research and development analysis has been performed and recommendations on correction of CHP technical solutions have been elaborated in the work presented here.

The analysis was performed for the following main variants of standard construction.

  1. CCCP with double-block and single-block diagrams on the basis of gas-turbine units MS6001FA;
  2. Condensation CCCP with double-block and single-block diagrams on the basis of gas-turbine units MS6001FA;
  3. Gas-turbine unit build-up with heat recovery steam generator for operation with the steam collector with the purpose of reconstruction of existing steam power range-type power plants (40, 90 и 130 at);
  4. CCGT with heat recovery hot water boiler and bypass center for regulating heat load.

All the main variants have options of indoor/outdoor installation with condensation/heat-extraction unit.

Customer

CJSC “Energy Forecasting Agency”

Services

Appraisal and provision of recommendations on correction of materials, developed by the JSC “Dneprvnipienergoprom” within the framework of R&D “Development of standard CHP projects on the basis of gas-turbine units 6FA”

Term of The Contract

2013