+7 (495) 228-16-48

info@sse-engineering.ru

17 Butlerova Street, OFC 1D

Moscow, Russia, 117342

9:00 am - 6:00 pm

Mon - Fri

PROJECTS

Compressor station-18 “Myshkin” | ССИ Инжиниринг

COMPRESSOR STATION-18 “MYSHKIN”

Development of design documentation and detailed design of construction of highly-efficient utilization heat-and-power complexes at the Compressor station-18 “Myshkin”.

CUSTOMER

JSC “Gazprom power holding”

DESCRIPTION OF THE PROJECT

Highly-efficient utilization heat-and-power complex at the Compressor station-18 “Myshkin” for the needs of the JSC “Gazprom power holding”

LOCATION

Myshkin city, Yaroslavl region, Russia

SERVICES

Development of design documentation and detailed design of construction of highly-efficient utilization heat-and-power complexes at the Compressor station-18 “Myshkin”

TERM OF THE CONTRACT

2013–2014

​​​​​​​