Feasibility Study for The “Installation of Own Electrical Power Generation Turbine (Mini-CHP) Parallel to The Pressure-Reducing Cooling Station” Project

Scope of Work:

  • Development of rationale and solutions for the most efficient implementation of a turbine generator based on steam turbines with backpressure, and development of documentation for installation of steam lines, water lines and necessary piping. 
  • Feasibility study of construction and/or reconstruction of the existing switchgears. 
  • Development of rationale for the most efficient option of the turbine generator connection to the existing network.
  • Development of rationale for greenfield construction and/or expansion of the existing electrical network facilities.
  • Development of rationale for layout, schematics and design of equipment required for the turbine generators connection to and synchronization with the network.
  • Development of rationale for the mini-CHP location, development of architectural and layout solutions.
  • Development and justification of the most effective turbine generator instrumentation and control configuration to ensure proper performance.
  • Evaluation of the mini-CHP influence on the plant networks, brief analysis of the mini-CHP performance in normal, repair and post-accident modes.
  • Investment cost estimate.

Customer

Sibur-Neftekhim JSC

Description of The Project

Turbines for own electrical power generation

Location

Dzerzhinsk, Nizhniy Novgorod Region, Russia

Services

Project feasibility study

Term of The Contract

2014