+7 (495) 228-16-48

info@sse-engineering.ru

17 Butlerova Street, OFC 1D

Moscow, Russia, 117342

9:00 am - 6:00 pm

Mon - Fri

PROJECTS

GT Factory GE | ССИ Инжиниринг

GT FACTORY GE

Factory with an area of 20 hectares to be built in the city of Rybinsk (Yaroslavl region) for the production and servicing of 6FA gas turbine units with output of 77 MW with low emission levels. Production will satisfy the growing demand for high efficiency medium size power units for combined thermal and electric production projects.

 

Scope of work:

 

  • Two-stage design:

 

  1. Design of the assembly shop, offices and painting shop;
  2. Design of test bench, section of gas preparation unit and gas compressor station;

 

  • Development of tender documentation;
  • Сonsulting services for the sleelction of civil and installation work contractors´;
  • Technical support and supervision during construction period

CUSTOMER

JV Russian Gas Turbines (GE, InterRAO, Rostec Corporation)

LOCATION

Rybinsk, Yaroslavl region, Russia

TERM OF THE CONTRACT

2012–2014

​​​​​​​