KRASNOLENINSKIY OIL REFINERY

Design capacity of Krasnoleninskiy oil refinery — 280 000 ton per year. Krasnoleninskiy oil refinery combines two widely separated areas: the installation of primary oil refining and storage base and shipment of finished products and administrative building.

 

Scope of work:

 

  • Analysis of the current state of power systems, power consumption characteristics — load profiles, consumption forecast;
  • Study of possible options for own generation construction;
  • Determination of power plants capacity based on the production load schedules and other consumers;
  • Comparison of different options for power generation equipment: gas piston and gas turbine plants, plants operating on diesel, gas-diesel and oil-fuel;
  • Study of technical solutions for using thermal power of flue gases to produce steam and hot water;
  • Preparation of preliminary construction schedule of energy facilities, indicating the terms;
  • Determination of specific indicators of capital costs per unit of installed capacity and the cost of operating expenses for the period up to 2030;
  • Performance indicators estimation (NPV, PI, IRR, DPP) on construction options of own generation.

CUSTOMER

ТNК-ВР Management JSC.

DESCRIPTION OF THE PROJECT

Oil refinery facility

LOCATION

Russia, Khanty-Mansiysk Autonomous District, Nyagan

SERVICES

Feasibility study development of options for own generation

TERM OF THE CONTRACT

2010–2011

​​​​​​​