Pitkyaranta
The result of the work is a report, stating the following:
- Two versions of the technical solution for power production:
- Maximum possible own power production in the course of the internal enterprise’s heat consumption.
- Total satisfaction of the enterprise requirements in power owing to own power production;
- Cost estimate and definition of the economic effectiveness of both versions of the technical solution;
- Organizing a separate enterprise for city heating by the combined heat and power plant, or construction of a new boiler.
- Reduction of BOP needs of the CHP (heat energy, electric energy);
- Records management organization.