ZHAIKMUNAY
Oil and gas condensate deposit Chinarevskoe, the Republic of Kazakhstan
Blake Street Energy
Naro-Fominsk, Moscow Region, Russia
Feasibility Study for The “Installation of Own Electrical Power Generation Turbine (Mini-CHP) Parallel to The Pressure-Reducing Cooling Station” Project
Dzerzhinsk, Nizhniy Novgorod Region, Russia
Groznenskaya CHP
Grozny, the Chechen Republic, RF (Russian Federation)
Transfer of The Central US (Station Management) of Mosenergo JSC to The New Location (2nd Stage)
Moscow RF (Russian Federation)
Combined Cycle Gas Turbine Unit (CCGT) at The Production Site of OJSC “National Joint-Stock Company “Azote”
Novomoskovsk, Tula Oblast, RF (Russian Federation)
Development of Justification of Investments in Construction (JOIC) of an Industrial Boiler Station/HPP (Heating Power Plant) For OOO Sibur
It is assumed that the boiler station/HPP is being constructed close to the industrial enterprise located in the Western Siberia region
Elegest Mining and Processing Complex
The Republic of Tyva, Russia
28 Metro Stations and a Transport and Transfer Hub in Moscow
Russia, Moscow
Power Generation Source for an Open Joint Stock Company “Volga”
Russia, Nizhny Novgorod region, Balakhna